Fire Hydrant System Commissioning Booster Testing including Pre-Inspection Compliance Report/Checklist
Fire Hydrant System Commissioning Booster Testing
5 Yearly Fire Hydrant System Maintenance Booster Testing
Flow & Pressure Testing - Street & On-site Fire Hydrants
Fire Hose Reel Flow Testing & Tagging
Annual Fire Hydrant System Flow and Pressure Testing
Portable Fire Equipment Installation & Maintenance
Fire Drafting Services - Evacuation Diagrams / Zone Plans / Block Plans
Pre-inspection of the Fire Hydrant System
CFC conducts a pre-inspection of the Fire Hydrant System before testing can be completed. This ensures that the system is complete and ready for testing.
The following items are included in the pre-inspection:
CFC will provide a pre-inspection report/checklist detailing any outstanding items that need to be completed.
Fire Safety Equipment Signage (FSES) documentation will be provided to assist with signage requirements for the fire hydrant system. The FSES document has been compiled from the National Construction Codes (BCA), Australian Standards, and DFES Operational Requirements.
Testing of the Fire Hydrant System
Testing of the Fire Hydrant System is undertaken in accordance with AS2419 Section 10. The following tests are performed:
Complete Fire Compliance will provide a commissioning test report with photo evidence for the Fire Hydrant System after on-site testing is completed.
Please note that the Fire Hydrant System Commissioning Test Results provided by CFC are for the hydraulic performance of the fire hydrant system only.